AAS completed the fastest ever built 95 MW rental power plant in history of KSA:
Various press clippings about the 95 MW rental power plant project from reputable regional and international publications:
http://goo.gl/GIk4EZ
http://goo.gl/4gxg3l
http://goo.gl/1QKlcI
A commendation letter from the client recognizing AAS' efficient use of electricity throughout the project, leading to savings for KSA:
Some pictures of the project:
The 95 MW rental power plant in Al Kharj, Saudi Arabia. The fastest built 95 MW temporary power plant in history of Saudi Arabia and the biggest temporary power plant ever installed in the country
AAS employed generators with intelligent switchgears, control & protection systems and monitoring programs that were capable of directly connecting to the SEC grid at Al Kharj and of instantly varying operational modes
AAS ensured that the over 100 in-house and local engineers working at the site were trained, monitored and evaluated to correctly and safely execute at every stage of the installation to avoid wasted man-hours
The project extended career opportunities to local Saudi engineers who were hired, trained, monitored and evaluated on global industry best practices in operations, project management and HSE
The project also involved local women engineers
Some of the in-house and local engineers that helped made the record-breaking installation of the project possible